    AUSTRALIAN STANDARD

    AS 3798 — Earthworks and Fill Compaction


    AS 3798 gives guidelines for earthworks on residential and commercial developments — including how engineered fill under a slab should be placed, compacted and tested. On a cut-and-fill lot, it underpins the ground your slab sits on.

    2 August 20263 min readAdam Gates · QBCC Lic. 1318443 · Building Inspector · Verify on QBCC
    On-site building inspection photo from a VG Inspect AS 3798 job in SEQ
    On-site building inspection photo from a VG Inspect AS 3798 job in SEQ

    AS 3798 is about the ground before the slab. On a greenfield, cut-and-fill lot — common across South East Queensland's growth corridors — the quality of the fill under your slab is as important as the slab itself.

    What AS 3798 actually means

    AS 3798 provides guidelines for earthworks on residential and commercial developments, including the placement, compaction and testing of controlled (engineered) fill. Its purpose is to give the ground the stability that structures built on it rely on.

    Where it applies in your new home

    Where a lot has been cut down in one area and filled in another to create a level building pad, part of your slab may sit on that fill. AS 3798 governs how the fill was placed and compacted, and how it is tested — so the slab has firm, non-settling support.

    What VG Inspect checks against it

    A building inspector does not carry out geotechnical testing — that is the geotechnical engineer's role. What the pre-pour inspection checks is that the fill compaction test reports exist and cover the site. Missing compaction test reports for the fill is a standard pre-pour red flag, because without them there is no evidence the ground beneath the slab will hold.

    What it does and doesn't cover

    AS 3798 covers the earthworks and fill. The soil-testing methods it relies on come from AS 1289, the residential slab design from AS 2870, and the concrete from AS 3600. Together they connect the ground to the structure.

    A VG Inspect QBCC-licensed inspector (QBCC Licence 1318443) checks for the compaction documentation at pre-pour, and reports the same day. Call 07 3180 8041 or book a pre-pour inspection online.

    Frequently Asked Questions

    Why does fill compaction matter under a slab?

    On a cut-and-fill lot, part of the slab may sit on engineered fill rather than natural ground. If that fill is not placed and compacted to the specification, it can settle over time — and the slab settles with it. AS 3798 covers how fill should be placed, compacted and tested so the ground beneath the slab is stable.

    How is fill compaction verified?

    Through compaction testing carried out by a geotechnical engineer, with the results provided as documentation. At the pre-pour inspection, an inspector checks that compaction test reports for the fill are present — their absence is a recognised pre-pour red flag.